6 Start-up
6.1
Operating conditions
"
The drive must be installed in a not free accessible machine room or a closed hoistway.
"
Be aware of the protection class speci
fi
ed on the name plate.
"
Do not operate the motor in an explosive atmosphere.
"
The ambient temperature may be within 0
°
C and +40
°
C.
"
Maximum permissible humidity 95 %, not wet.
"
Reduced motor output when installed 1000 m above sea level by 1 % per 100 m.
"
Please contact ZIEHL-ABEGG SE in case of orders deviating from the corresponding applica-
tion conditions.
6.2
First-time start-up
Before
fi
rst-time start-up, check the following:
"
Installation and electrical connection have been properly completed.
"
Safety devices are installed.
"
Installation waste and foreign bodies have been removed from the danger area.
"
The protective earth is connected.
"
Motor protection correctly connected and operative.
"
Cable entries closed.
"
The oil drain opening has been properly sealed.
"
Mounting, installation position and accessories are o.k.
"
The gearbox housing is secured against moving by stops and set screws in case of lateral or
inclined cable pull.
"
Connection data corresponds to the data on the name plate.
Warning!
"
Separately delivered traction sheave and/or cable pulley must be installed properly (see chapter
"Maintenance and service
–
changing the traction sheave").
"
If the machine has been dismantled for weight, transport or space reasons, the dismantled parts
must be reassembled in their original state and the fastening parts secured with the appropriate
tightening torque (see chapter "Maintenance and service
–
tightening torques and strength
values").
6.3
Operation
During operation, the drive must be checked for:
"
increased operating temperature
"
unusual noises
"
possible oil leaks
CAUTION!
Caution!
"
If irregularities are discovered during operation, the drive must be shut down immediately and
the cause of the fault determined (see chapter "Faults, causes and remedies").
The fault table lists possible faults, their causes and suggested remedies. If the cause cannot be
found or it is not possible to repair the fault by your own means, please consult the after-sales service.
CAUTION!
Caution!
"
If the safety brake (if available) is opened before starting a ride, no further ride may be started.
An appropriate signal must be sent to the lift control by the micro switch on the safety brake.
6.4
Drive approval test
Half load test
The lift must be easily movable in both directions by the hand wheel when the brake is open.
Half load test (alternative):
With half load the motor current has to be measured in up and down direction. Mostly this is possible
at the VVVF. (Please see operating instructions of your VVVF). The measured currents should not
divert by more than 10 %.
2ULJLQDORSHUDWLQJLQVWUXFWLRQV
ZAS0
Start-up
A-TBA11_06-GB
Part.-No. 01008051-GB
19/72
Summary of Contents for ZAS0
Page 1: ...6 OHYDWRU PDFKLQH ZLWK JHDU 2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV 6WRUH IRU IXWXUH XVH 7 B 3DUW 1R 8...
Page 38: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 38 72...
Page 40: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 40 72...
Page 41: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 41 72...
Page 42: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 42 72...
Page 43: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 43 72...
Page 45: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 45 72...
Page 47: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 47 72...
Page 48: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 48 72...
Page 49: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 49 72...
Page 50: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 50 72...
Page 51: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 51 72...
Page 53: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 53 72...
Page 54: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 54 72...
Page 55: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 55 72...
Page 56: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 56 72...
Page 58: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 58 72...
Page 60: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 60 72...
Page 61: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 61 72...
Page 62: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 62 72...
Page 63: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 63 72...
Page 65: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 65 72...
Page 66: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 66 72...
Page 68: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 68 72...
Page 69: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 69 72...
Page 70: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 70 72...
Page 71: ...2ULJLQDO RSHUDWLQJ LQVWUXFWLRQV ZAS0 Enclosure A TBA11_06 GB Part No 01008051 GB 71 72...