Zero UAV (Beijing) Intelligent Technology Co., Ltd. 5
3.1.1
Landing gear installations
Step1, fix the vertical pipe(long pipe) and horizontal pipe(short pipe) by a M3*10 screw
Step2, loosen four M3*25 screws, install two pipe clamp to vertical pipe,
insert the spring to vertical pipe.
Tighten four M3*25
screws,
horizontal pipe(short pipe) should face to the head of copter.
Step3, tighten two M4*30 screws, fix the landing gear.
M4×30 Screws
(2 pcs)
M3×25 Screws
(4 pcs)
pipe clamp
(2 pcs)
vertical pipe
(long pipe)
horizontal pipe
(short pipe)
vertical pipe
(long pipe)
Figure 2 Landing gear installations