Z 2500-130/150
22
Installation
www.zepro.com
A
B
100 mm
200 mm
Image 24. Quick connector location
4. Then place the quick connector at least 100 mm outside or inside the measured point (B), see Image 24.
5. Route the cable through the cable grommet in the support frame. See section "6.7 Cable lead-through" on page 25.
6. Connect the cables to the control card, see wiring diagram in section "9.4 Connecting warning light-
ing and foot controls" on page 44 and section "9.7 Connecting control device" on page 47.
Make sure that the control card is disconnected from power before connecting peripheral equipment.
Risk of damage.
m
WARNING!
Summary of Contents for Z 2500-130 DA
Page 2: ......
Page 77: ...Z 2500 130 150 Specifications 77 www zepro com Image 92 Loading diagram 18 4 Loading diagram...
Page 79: ......