
Z 10/15/20
22
Installation
www.zepro.com
Image 25. Installing cabling
3.
Route the cable along the 1st boom and fix with
cable ties according to Image 25. Then route the
cable to the hydraulic unit along the front of the
support frame and fix it together with the existing
cabling with cable ties.
Route the cable between the platform and the lift
arm's pipe so that it is well protected when the
platform hits the ground.
Leave enough "slack" to the first cable tie so that
the cable is not at risk of being damaged when
the lift is operated.
NOTE.
4. Connect the cables to the control card, see wir-
ing diagram in section "8.4 Connecting Open
Platform Alarm" on page 38 and section "8.6
Connecting controllers" on page 40.
Summary of Contents for Z 10
Page 2: ......