
Z 10/15/20
Installation workflow
11
www.zepro.com
3
Installation workflow
3.1
Installing the support frame
• Calculating the installed dimensions
• Attaching the mounting jig to the rear beam
• Aligning the support frame
• Mounting chassis brackets
• Detaching the mounting jig
3.2
Electrical connections
• Installing the controller
• Installing the controller cables
• Installing the main power cable
3.3
Installing the platform
• Installing the platform
• Installing seals and end stops
• Installing the armstops
3.4
Installing the cylinders
• Adjusting the tilting cylinder
• Testing
3.5
Attaching stickers
Summary of Contents for Z 10
Page 2: ......