Rescue Hoist FHTF
Check List
Startup
1) Lower hanging hoist mount
2) Install hoist
a. Install electrical connectors and tighten
b. Insert (2) ¼ inch bolts or pins through one
side
3) Raise hanging hoist mount
a. Install two load bolts
b. Lower chain hoist to apply load to load cells
4) Connect Control Boxes
5) Connect Pendant
6) Move mobile GSE into position beneath hoist
7) Push Circuit Breaker Switch - on
8) Turn Indicator switch – on
a. Zero the load reading if necessary
9) Lower wire rope and hook with pendant control
10) Attach wire rope and hook to mobile GSE
11) Operate mobile GSE per instruction