Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-2 rev 0
Page 6 of 20
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 4-1-2006
Assembly of FHTF:
o
Unpack the crates and verify all the parts arrived in good condition.
o
Slide the base plate into close proximity of its final position. Insure the floor is
clear of any debris before sliding the plate off the pallet into position.
o
With two people or a crane stand up the I beam upright
o
Place the attaching brackets into position See figure 5
o
Attach all the screws.
o
Once all bolts are in place and the beam has been positioned, tighten all
bolts securely.
o
Attach the two diagonal braces using the attaching clips and the angle stop as
shown in figure 6 and 7.
Attaching brackets (3)
Figure 5
Figure 6
Figure 7
Diagonal braces (2qty)
Attaching clips
Angle stop