Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-2 rev 0
Page 13 of 20
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 4-1-2006
Attach the plug from the Ground Power Cart to the receptacle provided.
Attach the 110 V AC power
Attach the ZGS-12201-1 (figure 19) , ZGS-12202-1 (figure 20 ) and the ZGS-12203-1
(figure 21) cable assemblies,
Figure 19
3 phase breaker switch
110 VAC 60 Hz input power
Figure 18