Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-2 rev 0
Page 12 of 20
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 4-1-2006
Installing the UUT
To install the UUT the hanging hoist mount is lowered by raising the hoist
mount with the chain hoist hand control just enough to allow removing the
pins from the lower load cell clevis. Remove the pins and then lower the
hanging mount to the lower position as shown in figure 16.
Install the UUT onto the post mount and install two ¼ inch pins.
Using the hand control raise the hanging hoist mount up to reattach the two
clevis pins, then lower the chain hoist to apply all the weight to the load cells.
Mount the electrical control boxes in the opening on the frame as shown in figure 17.
Figure 16
Pilot Control Panel
Crew Control Panel
3 phase power receptacle
Load Cell Readout
28 VDC power on switch
Figure 17