Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-2 rev 0
Page 7 of 20
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 4-1-2006
Attach the upper weldment and hoist support as shown in figure 8, using two people or
a crane and a ladder:
o
Attach the upper weldment to the upright beam
o
Attach the two hoist support angles as shown.
o
Attach the crane hoist with the U bolt provided and secure the upper hook of
the hoist to the hoist support angle.
o
Attach the chain capture bag to the hoist and place the chain inside the bag.
Figure 8
Upper Weldment
Upright Beam
Hoist Support Angles (2qty)
Hoist Crane
Chain Capture Bag
Not shown
U Bolt
Upper Hook (of hoist)