80 / 136
Identification: MD-AL-GI-00
Rev. 1.1 of 15/03/2021 - Application: GID
User’s Manual 3PH 20000TL - 33000TL-V2
Rev. 1.1 15/03/2021
8.
Uninstalling
8.1.
Uninstallation steps
Disconnect the inverter from the AC grid by opening the AC circuit breaker.
Disconnect the inverter from the photovoltaic strings by opening the DC circuit breaker.
Wait 5 minutes
Remove the DC connectors
Remove the AC terminals.
Unscrew the fixing bolt of the bracket and remove the inverter from the wall.
8.2.
Packaging
If possible, pack the product in its original packaging.
8.3.
Storage
Store the inverter in a dry place where the ambient temperature is between -25 and +60°C.
8.4.
Disposal
Zucchetti Centro Sistemi S.p.a. is not liable for the disposal of the equipment, or parts thereof, that does not
take place according to the regulations and standards in force in the country of installation.
The symbol of the crossed-out wheeled bin indicates that the equipment, at the end of its useful life, must be
disposed of separately from household waste.
This product must be handed over to the waste collection point in your local community for recycling.
For more information, please contact the waste collection authority in your country.
Inappropriate waste disposal could have negative effects on the environment and on human health due to
potentially hazardous substances.
With your cooperation in the correct disposal of this product, you contribute to the reuse, recycling and
recovery of the product, and to the protection of our environment.