23 / 136
Identification: MD-AL-GI-00
Rev. 1.1 of 15/03/2021 - Application: GID
User’s Manual 3PH 20000TL - 33000TL-V2
Rev. 1.1 15/03/2021
3.
Installation
General information in this chapter
This chapter describes how to install the 3PH 20000TL- 33000TL-V2 inverter.
Installation notes:
DO NOT install 3PH 20000TL - 33000TL-V2 inverters near flammable materials.
DO NOT install 3PH 20000TL - 33000TL-V2 inverters in an area where
flammable or explosive materials are stored.
Danger
The housing and heat sink may become very hot while the inverter is running,
DO NOT install the inverter in places where they may be touched inadvertently.
Warning
Consider the weight of the inverter when handling and transporting the inverter.
Choose an appropriate mounting position and surface.
Assign at least two people to install the inverter.
Attention
A. Installation process
This section describes the process for installing the 3PH 20000TL - 33000TL-V2 inverter
B. Checks before installation
This section describes the checks to carry out on the outer packaging, on the inverter and its components
C. Installation tools
This section describes the tools needed to install the inverter and to make the electrical connections
D. Installation position
This section describes the characteristics of the installation site of the inverter
E. Moving the inverter
This section describes how to move the inverter to the installation position
F. Installing the inverter
This section describes the steps for mounting the inverter on the wall