Spectrum Z™510 3D Printer Hardware Manual
Quick Start Guide
www.3dpuser.com
15
10/2/07
All Rights Reserved
4 Quick Start Guide
This section is a short step-by-step process of how to get a print job running on your printer. For a more
detailed explanation, see
Routine Operations
,
Using the ZPrint Firmware and Software
, and
Post Process-
ing the Part
.
4.1 Preparing The 3D Printer
1. Fill the feed box with powder.
2. With the printer offline, spread powder over build area by pressing the
Spread
button on the control
panel for four spreads. The printer will automatically spread powder over the build area.
3. Clean the service station by rinsing and wiping the parking caps and rubber wiper.