8-10
8-11
IM 11Y01B01-01E-A 6th Edition :Feb 13, 2013-00
<8. VALIDATION AND CALIBRATION>
MANUAL OffLINE VALIDATIONS
Enter into the Advanced Menu, Calibrate &
Validate section, Off-Line Validations.
Choose Check gas 1, 2 or 3 and select Manual
Validation.
AUTOMATIC OffLINE VALIDATIONS
The Validations may be for Gas 1, Gas 2 or Two
Gas Validation (such as Zero & Span Check, or
20% & 80% FS checks as required by some
regulatory applications).
The Offline Validations can also be automatically
configured. Refer to later section for details.
Local Initiate
will start the automatic online
validation sequence when selected. It will use
the existing ‘Settings’ (see below for details on
‘Settings’).
Remote Initiate will enable/disable monitoring
of the selected “Remote Initiate” contacts on
TB-2 within the Launch Unit. When enabled, the
analyzer will detect the chosen contact closure
and automatically start the online validation
sequence.
Time Initiate will allow input of a specified time
to automatically start online validation sequence
once every day, every week, every 2 weeks, or
every 4 weeks.