3 Installation
3.2 Site Preparation
3.2
Site Preparation
To prepare your site, proceed as follows:
1. Clear the floor space needed for the EcoTrim ET-1024 System (see
). Allow an additional 1.2 to 1.5 m (4 to 5 ft) on all sides of the
work cell to facilitate installation.
2. Gather all customer-supplied items and required tools (refer to
Fig. 3-1: Installation Dimensions for the EcoTrim-1024 System
WARNING
Be sure to allow for sufficient room for maintenance on the robot,
DX200 controllers, and other peripheral equipment. Failure to observe
this precaution could result in injury to personnel during system
maintenance.