
3 Installation
3.4 Installing the Operator Station Pedestal (Option)
3-6
175932-1CD
175932-1CD
EcoTrim ET-1024 System
3.4
Installing the Operator Station Pedestal (Option)
To install the Operator Station pedestal, proceed as follows:
1. Locate the Operator Station pedestal.
2. Carefully remove the protective plastic wrapping from the Operator
Station pedestal.
3. Inspect the Operator Station pedestal for shipping damage.
4. Place the Operator Station pedestal outside the light curtain fence
) for the recommended location).
5. Secure the Operator Station pedestal to the floor. Use a suitable
concrete drill bit and special anchor (lag) bolts (refer to
for
the correct drill bit and anchor bolt). Be sure to remove all concrete
dust from the drilled hole before driving each anchor bolt.
3.5
Light Curtain Alignment
The light curtain Send unit and Receive unit must be accurately
positioned, relative to each other, to ensure correct operation. Complete
alignment procedures are included in the light curtain documentation that
is included with your EcoTrim ET-1024 System (refer to
).
NOTE
If you notice any equipment damage, notify your shipping
contractor as soon as possible.
CAUTION
Be absolutely certain of the correct location for the Operator Station
pedestal before securing the pedestal with anchor (lag) bolts.
40 of 64