RMB/ENERGIE GmbH | 3
Operation manual CHP 5.0 - 30.0 | Status 01.2020
7. Operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
8. Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
9.
Service repairs . . . . . . . . . . . . . . . . . . . . . . . 32
. . . . . . . . . . . . . . . . . . . . . . . . . 33
11. Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
12. Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
12.2.1 Heating system variant 1 –
1 CHP, 1 buffer tank, peak load
boiler connected directly to buffer
tank . . . . . . . . . . . . . . . . . . . . . . . . . . 36
12.2.2 Heating system variant 2 –
1 CHP, 2 buffer tanks, peak load
boiler connected directly to buffer
tank . . . . . . . . . . . . . . . . . . . . . . . . . . 37
12.2.3 Heating system variant 3 –
1 CHP, 1 buffer tank, peak load
boiler connected to buffer tank via
hydraulic separator . . . . . . . . . . . . . . 38
12.2.4 Heating system variant 4 –
1 CHP, 2 buffer tanks, peak load
boiler connected to buffer tank via
hydraulic separator . . . . . . . . . . . . . . 39
12.2.5 Heating system variant 5 –
2 CHP, 2 buffer tanks, peak load
boiler connected to buffer tank via
hydraulic separator . . . . . . . . . . . . . . 40
12.3 EC declaration of conformity . . . . . . . . . 41
12.4 Proof of conformity - Generation unit . . . . . 42
Contents