RMB/ENERGIE GmbH | 39
appendix
Operation manual CHP 5.0 - 30.0 | Status 01.2020
12.2.4 Heating system variant 4 –
1 CHP, 2 buffer tanks, peak load boiler connected to buffer tank via hydraulic separator
T3
T4
T3
T4
T1
T2
T1
T2
SLK
SLK
CHP
1
2 3
4
5
6
7
8
9
10
T
M
11
12
22
23
21
24
20
25
19
18
17
15 16
13
28
27
29
30
14
T
26
31
T5
1
Shut-off
2
Circulating pump
3
Shut-off
4
Shut-off
5
Combination filter
6
Shut-off
7
Drain
8
Safety valve
9
Cap valve
10 Expansion tank
11 Buffer tank
12 Buffer tank
13 Drinking water tank
14 Temperature sensor
15 Shut-off
16 Circulating pump
17 Shut-off
18 Non-return valve
19 Ventilation
20 Shut-off
21 3-way mixer
22 Shut-off
23 Non-return valve
24 Circulating pump
25 Heating circuit consumers
26 Temperature sensor
27 Hydr. switches
28 Ventilation
29 Circulating pump
30 Non-return valve
31 Ventilation
–––
Supply
••• Return