6. Commissioning
D
WARNING!
Hazard caused by improperly assembling the
system!
Improperly installed systems can cause serious injuries
or material damage to the system or the building.
A
Ensure that the system is installed in accordance
with the regulations and that the commissioning can
be carried out.
The system must be inspected by the manufacturer (or
a specialist partner authorised by the manufacturer)
in accordance with the specifications of the
commissioning certificate.
Once the inspection has been passed, the system will
be released for permanent operation
If the system fails the check, the manufacturer will take
appropriate measures, e.g. request a repair.