RMB/ENERGIE GmbH | 33
Disassembly
Operation manual CHP 5.0 - 30.0 | Status 01.2020
10. Disassembly
D
WARNING!
Hazard caused by failing to observe the
disassembly instructions!
This chapter contains important information regarding
the correct way to disassemble the system. Failing to
observe such information can lead to severe injuries.
A
Read this chapter carefully before disassembling
the system.
A
Follow the safety instructions.
A
Wait for the system to cool down before
disassembling it.
A
Ensure that the cables are deenergised.
A
Ensure that the cables remain deenergised during
the work.
The disassembly must only be performed by trained
personnel.
Electrical work must only be performed by qualified,
skilled electricians.
D
“2.2.3 Trained personnel” (page 6).
A
Switch off the system.
“RMB/Control” operating manual.
A
Close all valves in the system.
A
Close all valves in the heating system.
A
Remove all cables from the control cabinet that are
not connected to the generation unit.
A
Remove the lines from the generation unit:
B
Buffer supply line
B
Buffer return line
B
Gas
B
Expansion tank
B
Condensate
B
Flue gas
B
Exhaust air
A
Remove the MSM filter.
A
Remove the lower covers from the generation unit.
A
Remove the ventilation grill.
A
Remove the lines from the expansion tank
connection block.
A
Unscrew the expansion tank connection block.