24 | RMB/ENERGIE GmbH
assembly
Operation manual CHP 5.0 - 30.0 | Status 01.2020
5.3.7 Connecting the temperature sensors
T1
T2
T3
T4
A
Attach four temperature sensors (T1-T4) to the
buffer tank. When attaching, bear in mind the
number of buffer tanks.
D
“12.2 Hydraulic diagrams” (page 35).
A
Connect a temperature sensor (T5) to the supply
line of the heating circuit.
D
“12.2 Hydraulic diagrams” (page 35).
A
Guide the cables from the temperature sensors (T1-
T5) to the control cabinet.
Observe the associated wiring diagrams for the
electrical connection.
Wiring diagrams.
5.3.8 Connecting the modem
When connecting the modem, the following points must
be observed:
B
If the modem is subjected to high temperatures, it
may not function properly.
B
The length of the connection cable between the
control cabinet and the modem must not exceed
100 m.
A
Fit the modem such that reception is guaranteed.
A
Connect the modem:
Modem manual.