38 | RMB/ENERGIE GmbH
appendix
Operation manual CHP 5.0 - 30.0 | Status 01.2020
12.2.3 Heating system variant 3 –
1 CHP, 1 buffer tank, peak load boiler connected to buffer tank via hydraulic separator
T1
T2
T3
T4
T1
T2
T3
T4
SLK
SLK
CHP
1
2 3
4
5
6
T
M
15
17
18
19
16
20
14
13
12
11 9
8
23
24
25
10
7
22
T
21
26
T5
27
28
29
30
1
Shut-off
2
Circulating pump
3
Shut-off
4
Shut-off
5
Combination filter
6
Shut-off
7
Buffer tank
8
Drinking water tank
9
Circulating pump
10 Temperature sensor
11 Shut-off
12 Shut-off
13 Non-return valve
14 Ventilation
15 Shut-off
16 Shut-off
17 Non-return valve
18 3-way mixer
19 Circulating pump
20 Heating circuit consumers
21 Temperature sensor
22 Ventilation
23 Hydr. switches
24 Circulating pump
25 Non-return valve
26 Ventilation
27 Drain
28 Safety valve
29 Cap valve
30 Expansion tank
–––
Supply
••• Return