52
14.
SETUP CHECKLIST
* Setup WE200 units using the following procedure:
Model
Serial number
Installation
Date
Installed by (company or
personnel)
Installation
approved by
Assessed
by
No.
Item
Implementation Procedure
Section No. & Instruction manual
reference page
Assessed
by
Specifications
1
Accessories
Confirm number of included
accessory items
10. Specifications
P.46
2
Installation
・
Check site visually.
Caution: check for hazards
2. Pre-Operation Procedures
・
At installation site
・・・
・
Prepare installation space.
・
Measure line voltage (power
distribution terminal, outlet, etc.)
with voltmeter.
・
Measure line voltage during
operation.
(Must meet required voltage
rating)
Caution: Confirm outlet rating or
breaker power rating meet
unit requirements.
2. Pre-Operation Procedures
10. Specifications
・
Standard
-
Power supply
P.5~6
P.46
Check base water
2. Pre-Operation Procedures
・
Base water
P.8
Orientation
1
Operation
Explain function of each component
as written in instruction manual
4. Operating procedure
1. Safety Precautions
List of dangerous substances
P.24~
27
P.1~4
50
2
Installation
of
RO membrane
Explanation of how to install the RO
membrane and perform initial washing
2. Pre-Operation Procedures
・
Installation
P.9~17
3
Error Codes
Explain error codes and reset
procedures as written in instruction
manual
8. Troubleshooting
・
Service & Repair
P.41~
45
4
Maintenance
& Inspection
Explain of inspection and
maintenance procedure as written
in instruction manual
6. Maintenance Procedures
・
Inspection & maintenance
P.34~
38
5
Installation
data entry
Completion
・
Fill in installation date and name
of installing personnel or
company
on unit “OK and
Service Sticker
”
・
Explain
how
to
contact
technician
9. Service & Repair
P.45
Summary of Contents for Pure Line WE200
Page 50: ...48 11 WIRING DIAGRAM ...