
24
4. OPERATION PROCEDURE
Prior Confirmation
Confirm the following before operating WE200.
(
1
)
Inspect water supply and drainage
・
Confirm that water supply hose is securely connected.
・
Confirm that drain hose runs to sink unobstructed and has no bends or kinks.
・
Open water tap.
・
Confirm that there are no leaks at connection joint in water supply hose.
(
2
)
Inspect power supply
・
Confirm that the power cable has been connected to proper outlet.
・
Confirm that the power cable has been securely and completely inserted into the cable
socket on main unit.
Operation Procedure
To begin operation, follow the procedures below.
Turning power ON
ELB
Control panel (initial display)
Turn the ELB, located on the right panel of
main unit, to
“ON (
|
)
”.
●
Initial
display
will
appear
for
approximately four seconds. Then, only
water quality lamp illuminates.
O
ON
OFF
l
Summary of Contents for Pure Line WE200
Page 50: ...48 11 WIRING DIAGRAM ...