2 - 18
SPEC
CABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1
Fuel tank breather hose
2
Clutch cable
3
Oil tank breather hose
4
Hot starter cable
5
Cylinder head breather hose
6
Cable guide
7
Hose guide
8
Brake hose
9
Engine stop switch lead
0
Clamp
A
Sub-wire harness
B
Throttle position sensor lead
C
Neutral switch lead
D
Oil hose
E
CDI magneto lead
F
Radiator breather hose
G
Carburetor breather hose
H
Carburetor overflow hose
Å
Insert the end of the fuel tank
breather hose into the hole in
the steering stem cap.
ı
Pass the hot starter cable
between the cylinder head
breather hose, oil tank breather
hose and ignition coil, then on
the outside of the left engine
bracket.
Ç
Pass the clutch cable through
the cable guides.
Î
Pass the clutch cable in front of
the radiator mounting boss.
‰
Fit the brake hose into the
guides on the protector.
Ï
Fasten the neutral switch lead
and CDI magneto lead to the
cable guide with a plastic locking
tie and cut off the tie end.
Ì
Fasten the engine stop switch
lead, neutral switch lead and
CDI magneto lead.
Ó
Fasten the engine stop switch
lead and sub-wire harness at the
protecting tube for the engine
stop switch lead.
È
Fasten the sub-wire harness
and hot starter cable at the white
tape for the sub-wire harness.
Ô
Fasten the sub-wire harness.
Pass the sub-wire harness
between the engine brackets.
A
C-C
B
C
C
A
D
F
C
1
2
3
4
5
6
6
7
8
G
H
G
0
0
D C
B
0
0
0
A
9 0
0
B
0
Ï
Ì
Ó
Ô
Ô
Ò
˜
ˆ
Ø
0
E
F
∏
Œ
Å
ı
Ç
Î
Ç
‰
Â
0
È