CYLINDER HEAD
5-20
EAS1SM1215
REMOVING THE CYLINDER HEAD
1. Remove:
• Intake camshaft
• Exhaust camshaft
Refer to “REMOVING THE CAMSHAFT” on
page 5-13.
2. Remove:
• Cylinder head nuts
• Cylinder head bolts
TIP
• Loosen the bolts in the proper sequence as
shown.
• Loosen each bolt 1/2 of a turn at a time. After
fully loosening all the bolts, remove them.
EAS1SM1216
CHECKING THE TIMING CHAIN GUIDE (IN-
TAKE SIDE)
1. Check:
• Timing chain guide (intake side)
Damage/wear
Replace.
EAS1SM1217
CHECKING THE CYLINDER HEAD
1. Eliminate:
• Combustion chamber carbon deposits
TIP
Use a rounded scraper, not a sharp instrument,
in order not to damage or scratch the spark
plug bore threads.
2. Check:
• Cylinder head
Damage/scratches
Replace.
TIP
When replacing the cylinder head, replace also
the valve.
“CHECKING THE VALVE SEATS” on page
5-25.
• Cylinder head coolant passages
Mineral deposits/rust
Eliminate.
3. Measure:
• Cylinder head warpage
Out of specification
Resurface the cylin-
der head.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Place a straightedge and a thickness gauge
across the cylinder head.
b. Measure the warpage.
c. If the limit is exceeded, resurface the cylin-
der head as follows.
d. Place a 400–600 grit wet sandpaper on a
surface plate, and resurface the cylinder
head using a figure-eight sanding pattern.
TIP
To ensure an even surface, turn the cylinder
head several times.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
6
1
2
3
5
4
x2
x4
FWD
Warpage limit
0.05 mm (0.0020 in)
Summary of Contents for YZ250F(E)
Page 4: ......
Page 10: ......
Page 12: ......
Page 16: ...LOCATION OF IMPORTANT LABELS 1 2 EUR...
Page 17: ...LOCATION OF IMPORTANT LABELS 1 3 AUS NZL ZAF...
Page 42: ...CLEANING AND STORAGE 1 28...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EAS1SM1064 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 190: ...CHAIN DRIVE 4 66...
Page 250: ...OIL PUMP AND BALANCER GEAR 5 57 c d 6 6 7 8 8 b...
Page 286: ......
Page 295: ...CHARGING SYSTEM 8 9 EAS1SM1326...
Page 321: ...FUEL PUMP SYSTEM 8 35 EAS1SM1333...
Page 322: ...ELECTRICAL COMPONENTS 8 36 ELECTRICAL COMPONENTS EAS1SM1334 9 10 1 2 3 4 5 6 7 8...
Page 324: ...ELECTRICAL COMPONENTS 8 38 CHECKING THE SWITCHES B Y P Sb 2 1...
Page 325: ...ELECTRICAL COMPONENTS 8 39 1 Engine stop switch 2 Neutral switch...
Page 334: ...ELECTRICAL COMPONENTS 8 48...
Page 342: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...
Page 353: ......
Page 354: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER...