ENGINE REMOVAL
5-2
7
Exhaust pipe 1 protector
1
8
Exhaust pipe 2 protector
1
9
Silencer body
1
10
Silencer cap
1
For installation, reverse the removal proce-
dure.
Removing the exhaust pipe
Order
Part name
Q’ty
Remarks
10
5
9
2
6
1
6
6
3
8
4
7
(8)
(6)
30 Nm (3.0 m
•
kgf, 22 ft
•
Ibf)
T
.R
.
30 Nm (3.0 m
•
kgf, 22 ft
•
Ibf)
T
.R
.
8 Nm (0.8 m
•
kgf, 5.8 ft
•
Ibf)
T
.R
.
10 Nm (1.0 m
•
kgf, 7.2 ft
•
Ibf)
T
.R.
New
New
10 Nm (1.0 m
•
kgf, 7.2 ft
•
Ibf)
T
.R.
12 Nm (1.2 m
•
kgf, 8.7 ft
•
Ibf)
T
.R.
12 Nm (1.2 m
•
kgf, 8.7 ft
•
Ibf)
T
.R.
20 Nm (2.0 m
•
kgf, 14 ft
•
Ibf)
T
.R
.
New
1st
2nd 20 Nm (2.0 m
•
kgf, 14 ft
•
lbf)
13 Nm (1.3 m
•
kg , 9.4 ft
•
lbf)
T
.R
.
LT
LT
LT
Summary of Contents for YZ250F(E)
Page 4: ......
Page 10: ......
Page 12: ......
Page 16: ...LOCATION OF IMPORTANT LABELS 1 2 EUR...
Page 17: ...LOCATION OF IMPORTANT LABELS 1 3 AUS NZL ZAF...
Page 42: ...CLEANING AND STORAGE 1 28...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EAS1SM1064 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 190: ...CHAIN DRIVE 4 66...
Page 250: ...OIL PUMP AND BALANCER GEAR 5 57 c d 6 6 7 8 8 b...
Page 286: ......
Page 295: ...CHARGING SYSTEM 8 9 EAS1SM1326...
Page 321: ...FUEL PUMP SYSTEM 8 35 EAS1SM1333...
Page 322: ...ELECTRICAL COMPONENTS 8 36 ELECTRICAL COMPONENTS EAS1SM1334 9 10 1 2 3 4 5 6 7 8...
Page 324: ...ELECTRICAL COMPONENTS 8 38 CHECKING THE SWITCHES B Y P Sb 2 1...
Page 325: ...ELECTRICAL COMPONENTS 8 39 1 Engine stop switch 2 Neutral switch...
Page 334: ...ELECTRICAL COMPONENTS 8 48...
Page 342: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...
Page 353: ......
Page 354: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER...