ELECTRICAL SYSTEM
3-35
EAS1SM1114
ELECTRICAL SYSTEM
EAS1SM1115
CHECKING THE SPARK PLUG
1. Remove:
• Seat
• Air scoop (left/right)
Refer to “GENERAL CHASSIS” on page 4-
1.
• Fuel tank “1”
Refer to “FUEL TANK” on page 7-1.
ECA1DX1001
NOTICE
Do not use too much force to pull the hose.
TIP
Remove the fuel tank, turn this 180 ° clockwise,
and put it in the frame “2” as shown.
2. Remove:
• Spark plug cap
• Spark plug
Refer to “CAMSHAFT” on page 5-11.
ECA13330
NOTICE
In order not to allow the dirt accumulated
around the spark plug to drop from the
spark plug hole into the cylinder, clean it be-
fore removing the spark plug.
3. Check:
• Spark plug type
Wrong type
Replace.
4. Check:
• Electrode
Damage/wear
Replace the spark plug.
• Insulator
Abnormal color
Replace the spark plug.
Normal color is medium-to-light tan.
5. Clean:
• Spark plug
(with a spark plug cleaner or a wire brush)
6. Measure:
• Spark plug gap “a”
Out of specification
Adjust the spark plug
gap.
7. Install:
• Spark plug
TIP
Before installing the spark plug, clean the spark
plug and gasket surface.
8. Install:
• Spark plug cap
• Fuel tank
• Air scoop (left/right)
• Seat
• Side cover (left/right)
Refer to “GENERAL CHASSIS” on page 4-
1.
EAS1SM1116
CHECKING THE IGNITION TIMING
1. Remove:
• Timing mark accessing screw “1”
Manufacturer/model
NGK/LMAR8G
1
1
2
Spark plug gap
0.7–0.8 mm (0.028–0.031 in)
Spark plug
13 Nm (1.3 m·kgf, 9.4 ft·lbf)
T
R
.
.
1
Summary of Contents for YZ250F(E)
Page 4: ......
Page 10: ......
Page 12: ......
Page 16: ...LOCATION OF IMPORTANT LABELS 1 2 EUR...
Page 17: ...LOCATION OF IMPORTANT LABELS 1 3 AUS NZL ZAF...
Page 42: ...CLEANING AND STORAGE 1 28...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EAS1SM1064 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 190: ...CHAIN DRIVE 4 66...
Page 250: ...OIL PUMP AND BALANCER GEAR 5 57 c d 6 6 7 8 8 b...
Page 286: ......
Page 295: ...CHARGING SYSTEM 8 9 EAS1SM1326...
Page 321: ...FUEL PUMP SYSTEM 8 35 EAS1SM1333...
Page 322: ...ELECTRICAL COMPONENTS 8 36 ELECTRICAL COMPONENTS EAS1SM1334 9 10 1 2 3 4 5 6 7 8...
Page 324: ...ELECTRICAL COMPONENTS 8 38 CHECKING THE SWITCHES B Y P Sb 2 1...
Page 325: ...ELECTRICAL COMPONENTS 8 39 1 Engine stop switch 2 Neutral switch...
Page 334: ...ELECTRICAL COMPONENTS 8 48...
Page 342: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...
Page 353: ......
Page 354: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER...