2-34
D Route the handlebar switch lead
(left) and front turn signal light
lead (left) into the left under hole
of the headlight body.
E Route the front turn signal light
leads (left and right) in front of
the headlight stay.
F Route the speedometer cable
through the guide on the head-
light stay.
G To front brake master cylinder.
A Route the throttle cables through
the guide on the headlight stay.
B Route the meter leads, main
switch lead into the upper hole of
the headlight body.
C Route the handlebar switch lead
(left) inside of the clutch hose.
Fasten the handlebar switch
lead (left), clutch hose and start-
er cable with a plastic band.
1
Meter leads
2
Main switch lead
3
Starter cable
4
Handlebar switch lead (left)
5
Clutch hose
6
Brake hose
7
Handlebar switch lead (right)
SPEC
CABLE ROUTING
Summary of Contents for XJR1300(L) 99
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ...GEN INFO...
Page 18: ...GEN INFO...
Page 20: ...SPEC...
Page 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase...
Page 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS...
Page 56: ...SPEC...
Page 108: ...CHK ADJ...
Page 112: ...ENG...
Page 202: ...CARB...
Page 282: ...CHAS...
Page 284: ...ELEC...
Page 330: ...TRBL SHTG...
Page 336: ...TRBL SHTG...