8-3
Handlebar and handlebar switch
Lead routing
1.
Wrap the packing “1”, making sure to align
the upper edge of the packing with the up-
per edges of the tape markings “a” and “b”,
on the handlebar switch (right) lead “2” and
handlebar switch (left) leads “3”.
2.
Align the upper edge of the packing “1”
with the upper edge of the grommet “4”.
3.
Fasten the grommet “4” using the plastic
tie “5”.
4.
Wrap the packing “1”, making sure to align
the upper edge of the packing with the up-
per edges of the tape markings “a”, on the
buzzer lead “2” and steering sensor lead
“3”.
5.
Align the upper edge of the packing “1”
with the upper edge of the grommet “4”.
6.
Fasten the grommet “4” using the plastic
tie “5”.
Handlebar installation
After installing the handlebar, make sure
that the handlebar switch leads are not
pulled when the handlebar is turned to the
right and left.
1.
Install the handlebar “1” and upper handle-
bar holders “2”, and then tighten the bolts
“3” to the specified torque.
TIP:
• The upper handlebar holder “2” should be in-
stalled with the punch mark “a” facing down.
• Tighten the bolts “3” so that there is clear-
ance between the steering master and the
upper handlebar holders “2” at both ends of
the upper handlebar holders.
• Make sure that clearance “b” is narrower
than clearance “c”.
a. Green tape
b. Blue tape
a
b
3
2
1
1
4
5
a. Blue tape
a
3
2
1
1
4
5
Summary of Contents for WaveRunner VXR VX1800A
Page 1: ...SERVICE MANUAL WaveRunner VXS VX1800 F2W VXR VX1800A F2W F2W 28197 ZU 11 ...
Page 12: ...How to use this manual 1 7 UP Upside YDIS Yamaha Diagnostic System Abbreviation Description ...
Page 40: ...Technical tips 1 35 MEMO ...
Page 163: ...Oil separator tank and oil pan 5 72 3 4 4 4 4 4 9 4 1 5 6 10 11 7 2 3 8 ...
Page 180: ...Crankcase connecting rod and piston 5 89 MEMO ...
Page 204: ...6 23 Intermediate housing Intermediate housing bolt 2 17 Nm 1 7 kgf m 12 5 ft lb 1 2 3 ...
Page 205: ...Intermediate housing 6 24 MEMO ...
Page 251: ...Indication system 7 44 MEMO ...
Page 278: ...8 25 Exhaust system 6 Install the band Rubber hose clamp 2 3 5 Nm 0 35 kgf m 2 58 ft lb ...
Page 290: ...Deck and hull 8 37 MEMO ...
Page 312: ...Engine unit troubleshooting 9 21 MEMO ...
Page 313: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1 VXS VXR A 2 ...
Page 317: ......
Page 318: ...Mar 2015 CR E ...