7-11
Ignition system
Ignition system
Ignition spark check
When performing the spark gap check,
keep flammable gas or liquids away, since
this test can produce sparks.
1.
Connect the YDIS.
2.
Remove the ignition coil for the cylinder
that will be tested.
3.
Connect the ignition coil to the special ser-
vice tool “1”.
4.
Using the “Stationary test” of the YDIS,
check the ignition spark.
Do not touch any of the connections of the
special service tool leads.
5.
Disconnect the special service tool, and
then install the ignition coil.
Ignition coil check
1.
Disconnect the ignition coil couplers “a”.
2.
Supply power to the ECM, and then mea-
sure the input voltage at the ignition coil
coupler terminals (wire harness end).
Check the wire harness if out of specifica-
tion. Check the ECM output peak voltage if
within specification.
3.
Connect the test harness. See “Test lead
preparation” (7-10).
4.
Measure the ECM output peak voltage.
When checking the electrical components,
do not touch any of the connections of the
digital tester leads.
TIP:
• When measuring the ECM output peak volt-
age under the “Cranking” condition, discon-
nect the fuel injector couplers for all
cylinders.
• To crank the engine, connect the engine
shut-off cord (lanyard) to the engine shut-off
switch, and then push the engine start
switch.
• When measuring the ECM output peak volt-
age, use only a properly functioning ignition
coil. If the ignition coil is not functioning prop-
erly, ECM output peak voltage will not be
generated.
Ignition checker (Spark gap tester) “1”
90890-06754
Spark checker “1”
YM-34487
1
Input voltage
12 V (battery voltage)
Red/Yellow (R/Y)–Black (B)
a
B
R/Y
Summary of Contents for WaveRunner VXR VX1800A
Page 1: ...SERVICE MANUAL WaveRunner VXS VX1800 F2W VXR VX1800A F2W F2W 28197 ZU 11 ...
Page 12: ...How to use this manual 1 7 UP Upside YDIS Yamaha Diagnostic System Abbreviation Description ...
Page 40: ...Technical tips 1 35 MEMO ...
Page 163: ...Oil separator tank and oil pan 5 72 3 4 4 4 4 4 9 4 1 5 6 10 11 7 2 3 8 ...
Page 180: ...Crankcase connecting rod and piston 5 89 MEMO ...
Page 204: ...6 23 Intermediate housing Intermediate housing bolt 2 17 Nm 1 7 kgf m 12 5 ft lb 1 2 3 ...
Page 205: ...Intermediate housing 6 24 MEMO ...
Page 251: ...Indication system 7 44 MEMO ...
Page 278: ...8 25 Exhaust system 6 Install the band Rubber hose clamp 2 3 5 Nm 0 35 kgf m 2 58 ft lb ...
Page 290: ...Deck and hull 8 37 MEMO ...
Page 312: ...Engine unit troubleshooting 9 21 MEMO ...
Page 313: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1 VXS VXR A 2 ...
Page 317: ......
Page 318: ...Mar 2015 CR E ...