Control system
7-22
2.
Check the wire harness for continuity.
Replace if there is no continuity.
3.
Connect the APS coupler and ECM cou-
plers.
ETV relay check
1.
Remove the fuse box cover and ETV relay
“1”.
2.
Check the ETV relay. See “Main relay
check” (7-31).
3.
Measure the input voltage between the ter-
minal “a” and ground.
4.
Supply power to the ECM, and then mea-
sure the input voltage between the termi-
nals “a” and “b”.
5.
Install the ETV relay and fuse box cover.
APS circuit continuity
Terminal No.
Color
code
Coupler “a”
Coupler “b”, “c”
1
36
P/R
2
34
B/R
3
49
O/R
4
37
P/W
5
35
B/W
6
50
O/W
7
22
W/G
8
29
B/G
9
30
O/G
c
b
34
35
36
37
49
50
30 29
22
3 2
1
6 5 4
7
8
9
b
c
a
Input voltage
12 V (battery voltage)
Terminal “a”–Ground
Input voltage
12 V (battery voltage)
Terminal “a”–Terminal “b”
1
a
a
b
Summary of Contents for WaveRunner VXR VX1800A
Page 1: ...SERVICE MANUAL WaveRunner VXS VX1800 F2W VXR VX1800A F2W F2W 28197 ZU 11 ...
Page 12: ...How to use this manual 1 7 UP Upside YDIS Yamaha Diagnostic System Abbreviation Description ...
Page 40: ...Technical tips 1 35 MEMO ...
Page 163: ...Oil separator tank and oil pan 5 72 3 4 4 4 4 4 9 4 1 5 6 10 11 7 2 3 8 ...
Page 180: ...Crankcase connecting rod and piston 5 89 MEMO ...
Page 204: ...6 23 Intermediate housing Intermediate housing bolt 2 17 Nm 1 7 kgf m 12 5 ft lb 1 2 3 ...
Page 205: ...Intermediate housing 6 24 MEMO ...
Page 251: ...Indication system 7 44 MEMO ...
Page 278: ...8 25 Exhaust system 6 Install the band Rubber hose clamp 2 3 5 Nm 0 35 kgf m 2 58 ft lb ...
Page 290: ...Deck and hull 8 37 MEMO ...
Page 312: ...Engine unit troubleshooting 9 21 MEMO ...
Page 313: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1 VXS VXR A 2 ...
Page 317: ......
Page 318: ...Mar 2015 CR E ...