RiDE motor
8-28
10. Remove the RiDE motor “1”.
RiDE motor installation
1.
Hold the RiDE motor “1” at the installation
position of the hull.
2.
Install the plate “1”, and then tighten the
RiDE motor nuts “2” and RiDE motor bolts
“3” to the specified torque in the order [1],
[2], and so on.
3.
Install the shift arm “1” and trim arm “2”,
and then tighten the shift arm bolt “3” and
trim arm bolt “4” to the specified torque.
4.
Adjust the length “a” of the trim rod “1”.
• The trim rod joint must be screwed in
more than 8 mm (0.31 in).
• The shift rod joint must be screwed in
more than 9 mm (0.35 in).
5.
Turn the trim rod joint 180° so that the 2
holes “b” face in the opposite directions,
and then tighten the locknut “2” to the
specified torque.
6.
Adjust the length “c” of the shift rod “3”.
1
3
4
2
1
3
2
1
RiDE motor nuts “2”
17 Nm (1.7 kgf·m, 12.5 ft·lb)
RiDE motor bolts “3”
17 Nm (1.7 kgf·m, 12.5 ft·lb)
Shift arm bolt “3”
11 Nm (1.1 kgf·m, 8.1 ft·lb)
Trim arm bolt “4”
11 Nm (1.1 kgf·m, 8.1 ft·lb)
3
2
[1]
[2]
[
3
]
[4]
[5]
1
2
4
3
Summary of Contents for WaveRunner VXR VX1800A
Page 1: ...SERVICE MANUAL WaveRunner VXS VX1800 F2W VXR VX1800A F2W F2W 28197 ZU 11 ...
Page 12: ...How to use this manual 1 7 UP Upside YDIS Yamaha Diagnostic System Abbreviation Description ...
Page 40: ...Technical tips 1 35 MEMO ...
Page 163: ...Oil separator tank and oil pan 5 72 3 4 4 4 4 4 9 4 1 5 6 10 11 7 2 3 8 ...
Page 180: ...Crankcase connecting rod and piston 5 89 MEMO ...
Page 204: ...6 23 Intermediate housing Intermediate housing bolt 2 17 Nm 1 7 kgf m 12 5 ft lb 1 2 3 ...
Page 205: ...Intermediate housing 6 24 MEMO ...
Page 251: ...Indication system 7 44 MEMO ...
Page 278: ...8 25 Exhaust system 6 Install the band Rubber hose clamp 2 3 5 Nm 0 35 kgf m 2 58 ft lb ...
Page 290: ...Deck and hull 8 37 MEMO ...
Page 312: ...Engine unit troubleshooting 9 21 MEMO ...
Page 313: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1 VXS VXR A 2 ...
Page 317: ......
Page 318: ...Mar 2015 CR E ...