5-15
ENG
a
b
CYLINDER HEAD AND CYLINDER
4. Check:
•
Piston ring position
CAUTION:
•
Make sure that the ring ends are properly fitted
around the ring locating pins in the piston
grooves.
•
Be sure to check that the manufacturer’s marks
or numbers stamped on the rings face upward.
5. Install:
•
Gasket (cylinder)
NOTE:
Install the gasket (cylinder) with its projection
a
facing the AC magneto side.
CAUTION:
Always use new gasket.
6. Install:
•
Cylinder
NOTE:
Install the cylinder with one hand while compressing
the piston rings with the other hand.
7. Tighten:
•
Nuts (cylinder)
Nut (cylinder) :
28 Nm (2.8 m · kg, 20 ft · lb)
8. Install:
•
Gaskets (cylinder head)
NOTE:
Install with the mark
a
facing upwards and the
projection
b
on the intake side.
SEA5330
SEA5340
SEA5350
SEA5360
T
R
.
.
Summary of Contents for VX600ERG
Page 1: ...VX600ERG SX600G MM600G VT600G SERVICE MANUAL LIT 12618 02 20 8EA 28197 10 981059 ...
Page 57: ...2 43 INSP ADJ CARBURETORTUNING Guide for carburetion SEA2720 ...
Page 79: ...2 65 INSP ADJ REAR SUSPENSION ...
Page 220: ...8 21 ELEC CHARGING SYSTEM ...
Page 236: ...8 37 ELEC SIGNAL SYSTEM ...
Page 266: ...9 20 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Page 267: ...SPEC 9 21 CABLE ROUTING SEA9010 ...
Page 269: ...SPEC 9 23 CABLE ROUTING SEA9010 ...
Page 271: ...SPEC 9 25 CABLE ROUTING SEA9020 ...
Page 273: ...SPEC 9 27 CABLE ROUTING SEA9030 ...
Page 275: ...SPEC 9 29 CABLE ROUTING SEA9030 ...
Page 277: ...SPEC 9 31 CABLE ROUTING SEA9040 ...
Page 279: ...SPEC 9 33 CABLE ROUTING SEA9050 ...
Page 281: ...SPEC 9 35 CABLE ROUTING SEA9050 ...
Page 283: ...SPEC 9 37 CABLE ROUTING SEA9060 ...
Page 287: ...Printed in USA E CR PRINTED ON RECYCLED PAPER ...