2-20
INSP
ADJ
ENGAGEMENT SPEED CHECK
1. Place the machine on a level surface of hard-
packed snow.
2. Check:
•
Clutch engagement speed
Checking steps:
•
Start the engine, and open the throttle lever
gradually.
•
Check the engine speed when the machine starts
moving forward.
Out of specification
→
Adjust the primary sheave.
Engagement speed:
VX600ER/VT600 for U.S.A./Canada:
4,000
±
200 r/min
(3,800 ~ 4,200 r/min)
SX600:
4,200
±
200 r/min
(4,000 ~ 4,400 r/min)
MM600:
4,600
±
200 r/min
(4,400 ~ 4,800 r/min)
VT600 for Europe:
3,900
±
200 r/min
(3,700 ~ 4,100 r/min)
PARKING BRAKE PAD INSPECTION
1. Measure:
•
Parking brake pad thickness
a
Out of specification
→
Replace as a set.
Wear limit:
1.0 mm (0.04 in)
ENGAGEMENT SPEED CHECK/
PARKING BRAKE PAD INSPECTION
SEA2470
Summary of Contents for VX600ERG
Page 1: ...VX600ERG SX600G MM600G VT600G SERVICE MANUAL LIT 12618 02 20 8EA 28197 10 981059 ...
Page 57: ...2 43 INSP ADJ CARBURETORTUNING Guide for carburetion SEA2720 ...
Page 79: ...2 65 INSP ADJ REAR SUSPENSION ...
Page 220: ...8 21 ELEC CHARGING SYSTEM ...
Page 236: ...8 37 ELEC SIGNAL SYSTEM ...
Page 266: ...9 20 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Page 267: ...SPEC 9 21 CABLE ROUTING SEA9010 ...
Page 269: ...SPEC 9 23 CABLE ROUTING SEA9010 ...
Page 271: ...SPEC 9 25 CABLE ROUTING SEA9020 ...
Page 273: ...SPEC 9 27 CABLE ROUTING SEA9030 ...
Page 275: ...SPEC 9 29 CABLE ROUTING SEA9030 ...
Page 277: ...SPEC 9 31 CABLE ROUTING SEA9040 ...
Page 279: ...SPEC 9 33 CABLE ROUTING SEA9050 ...
Page 281: ...SPEC 9 35 CABLE ROUTING SEA9050 ...
Page 283: ...SPEC 9 37 CABLE ROUTING SEA9060 ...
Page 287: ...Printed in USA E CR PRINTED ON RECYCLED PAPER ...