3 - 30
INSP
ADJ
STEERING HEAD INSPECTION AND ADJUSTMENT
●
Install the upper bracket
A
, steering stem
nut
B
, cap
C
, handlebar
D
, upper han-
dlebar holder
E
, starter knob nut
F
and
number plate
G
.
NOTE:
●
The upper handlebar holder should be
installed with the punched mark
a
for-
ward.
●
Insert the end of fuel breather hose
H
into
the hole of the starter knob stay.
CAUTION:
First tighten the bolts on the front side of
the handlebar holder, and then tighten
the bolts on the rear side.
T
R
.
.
Pinch bolt (upper bracket):
25 Nm (2.5 m • kg, 18 ft • lb)
Steering stem nut:
110 Nm (11.0 m • kg, 80 ft • lb)
Handlebar upper holder:
23 Nm (2.3 m • kg, 17 ft • lb)
Starter knob nut:
1 Nm (0.1 m • kg, 0.7 ft • lb)
Number plate:
7 Nm (0.7 m • kg, 5.1 ft • lb)
TT-R125E/TT-R125LWE
●
Steering ring nut
Steering ring nut adjustment steps:
●
Remove the number plate and starter
knob.
●
Remove the main switch, handlebar and
upper bracket.
●
Remove the special washer
1
.
●
Remove the upper ring nut
2
, and rubber
washer
3
.
●
Loosen the lower ring nut
4
using the
steering nut wrench
5
.
Steering nut wrench:
YU-33975/90890-01403
Summary of Contents for TT-R125(W)
Page 1: ...TT R125 W TT R125E W TT R125LW W TT R125LWE W LEW 1B2 F8199 82...
Page 49: ...GEN INFO MEMO...
Page 185: ...INSP ADJ MEMO...
Page 577: ...ELEC MEMO...
Page 591: ...ELEC MEMO...
Page 611: ...ELEC MEMO...
Page 614: ......
Page 615: ......
Page 616: ...PRINTED IN BRAZIL E F G 05 2005 910 GYL 04 2006 1000 GYL...