5 - 98
ENG
e. Tighten the connecting rod nuts.
Refer to “INSTALLING THE CONNECTING
RODS AND PISTONS”.
f. Remove the connecting rod and big end
bearings.
Refer to “REMOVING THE CONNECTING
RODS AND PISTONS”.
g. Measure the compressed Plastigauge
®
width
e
on the crankshaft pin.
If the crankshaft-pin-to-big-end-bearing
clearance is out of specification, select
replacement big end bearings.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
2. Select:
• big end bearings (P
1
~ P
4
)
NOTE:
@
• The numbers stamped into the crankshaft
web and the numbers on the connecting rods
are used to determine the replacement big
end bearing sizes.
• “P
1
” ~ “P
4
” refer to the bearings shown in the
crankshaft illustration.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
For example, if the connecting rod “P
1
” and the
crankshaft web “P
1
” numbers are “6” and “1”
respectively, then the bearing size for “P
1
” is:
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
Bearing size of P
1
:
“P
1
” (connecting rod) – “P
1
” (crank-
shaft web)
6 – 1 = 5 (yellow)
BEARING COLOR CODE
1
blue
2
black
3
brown
4
green
5
yellow
6
pink
P
1
P
2
P
3
P
4
P
1
P
2
P
3
P
4
CONNECTING RODS AND PISTONS
Summary of Contents for FJR1300R
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM...
Page 531: ...8 35 ELEC LIGHTING SYSTEM...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...