3 - 60
CHK
ADJ
CHECKING AND ADJUSTING THE STEERING HEAD
4. Remove:
• steering stem nut
1
• washer
• upper bracket
2
(with the handlebars)
5. Adjust:
• steering head
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Remove the lock washer
1
, the upper ring
nut
2
, and the rubber washer
3
.
b. Tighten the lower ring nut
4
with a spanner
wrench
5
.
NOTE:
@
Set the torque wrench at a right angle to the
steering nut wrench.
c. Loosen the lower ring nut one turn and then
tighten it to specification with a steering nut
wrench.
WARNING
@
Do not overtighten the lower ring nut.
d. Check the steering head for looseness or
binding by turning the front fork all the way
in both directions. If any binding is felt,
remove the lower bracket and check the
upper and lower bearings.
Refer to “HANDLEBARS” and “STEERING
HEAD” in chapter 4.
e. Install the rubber washer.
f. Install the upper ring nut.
Spanner wrench
YU-33975
T
R
.
.
Lower ring nut (initial tightening
torque)
52 Nm (5.2 m · kg, 37 ft · lb)
T
R
.
.
Lower ring nut (final tightening
torque)
18 Nm (1.8 m · kg, 13 ft · lb)
Summary of Contents for FJR1300R
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM...
Page 531: ...8 35 ELEC LIGHTING SYSTEM...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...