5 - 16
ENG
CAMSHAFTS
4. Install:
• camshaft cap bolts
NOTE:
@
Tighten the camshaft cap bolts in stages and
in a crisscross pattern, working from the inner
caps out.
CAUTION:
@
• Lubricate the camshaft cap bolts with the
engine oil.
• The camshaft cap bolts must be tightened
evenly or damage to the cylinder head,
camshaft caps, and camshafts will result.
• Do not turn the crankshaft when installing
the camshaft to avoid damage or
improper valve timing.
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
5. Install:
• timing chain tensioner
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. While lightly pressing the timing chain ten-
sioner rod by hand, turn the tensioner rod
fully clockwise with a thin screwdriver
1
.
NOTE:
@
Make sure that the tensioner rod has been fully
set clockwise.
b. With the timing chain tensioner rod turned
all the way into the timing chain tensioner
housing (with the thin screwdriver still
installed), install the gasket and the timing
chain tensioner
2
onto the cylinder block.
WARNING
@
Always use a new gasket.
c. Tighten the timing chain tensioner bolts
3
to the specified torque.
T
R
.
.
Timing chain tensioner bolt
10 Nm (1.0 m · kg, 7.2 ft · lb)
Summary of Contents for FJR1300R
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM...
Page 531: ...8 35 ELEC LIGHTING SYSTEM...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...