2 - 24
SPEC
TIGHTENING TORQUES
NOTE:
1.First, tighten the lower ring nut approximately 52 Nm (5.2 m • kg, 37 ft • lb) by using the torque
wrench, then loosen the ring nut completely.
2.Retighten the lower ring nut to specification.
Connecting arm and swingarm
M10
48
4.8
35
Connecting arm and relay arm
M10
48
4.8
35
Rear shock assembly and relay arm
M10
40
4.0
29
Rear shock assembly and frame
M12
64
6.4
46
Relay arm and frame
M10
40
4.0
29
Swingarm pivot shaft and locknut
M28
115
11.5
85
Swingarm pivot shaft and pivot shaft nut
M18
125
12.5
90
Locknut retainer
M6
10
1.0
7.2
Final drive housing oil filler bolt
M14
23
2.3
17
Final drive housing oil drain bolt
M14
23
2.3
17
Final drive assembly and swingarm
M10
42
4.2
30
Left rider footrest bracket and frame
M8
28
2.8
20
Left rider footrest bracket and engine
M10
49
4.9
35
Left rider footrest bracket, sidestand bracket and
frame
M10
63
6.3
45
Ring gear bearing housing and final drive housing
M10
40
4.0
29
Ring gear bearing housing and final drive housing
M8
23
2.3
17
Stopper bolt
M10
9
0.9
6.5
Gear coupling and final drive pinion gear
M16
110
11.0
80
Final drive pinion gear bearing retainer
M65
110
11.0
80
Sidestand and sidestand bracket
M10
58
5.8
42
Centerstand bracket and frame
M10
55
5.5
40
Centerstand and centerstand bracket
M10
56
5.6
40
Rear frame and main frame (upper)
M8
28
2.8
20
Rear frame and main frame (lower)
M10
48
4.8
35
T-bar and frame
M10
78
7.8
56
Fuel pump and fuel tank
M5
4
0.4
2.9
Battery bracket and frame
M6
10
1.0
7.2
Battery holder and battery bracket
M6
10
1.0
7.2
Ignition coil
M6
10
1.0
7.2
Canister and canister bracket
M6
7
0.7
5.1
Canister
M6
12
1.2
8.7
Hose holder
M6
7
0.7
5.1
Part to be tightened
Thread
size
Tightening torque
Remarks
Nm
m·kg
ft·lb
Summary of Contents for FJR1300R
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM...
Page 531: ...8 35 ELEC LIGHTING SYSTEM...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...