4 - 83
CHAS
REAR SHOCK ABSORBER ASSEMBLY AND RELAY
ARM
EAS00685
REAR SHOCK ABSORBER ASSEMBLY AND RELAY ARM
5
5
8
2
2
3
3
4
13
11
1310
14
13
13
13
3
3
4
15
15
13 12
14
1
(3)
7
8
LS
9
6
LS
T
R
.
.
64 Nm (6.4 m
•
kg, 46 ft
•
Ib)
T
R
.
.
40 Nm (4.0 m
•
kg, 29 ft
•
Ib)
T
R
.
.
40 Nm (4.0 m
•
kg, 29 ft
•
Ib)
T
R
.
.
48 Nm (4.8 m
•
kg, 35 ft
•
Ib)
T
R
.
.
55 Nm (5.5 m
•
kg, 40 ft
•
Ib)
Order
Job/Part
Q’ty
Remarks
Removing the rear shock absorber
assembly and relay arm
Remove the parts in the order listed.
Rear wheel
Refer to “REAR WHEEL AND BRAKE
DISC”.
Mufflers/exhaust pipe
Refer to “ENGINE” in chapter 5.
1
Nut
3
2
Nut/washer/bolt
1/1/1 Bolt =
54
mm
(2.13 in)
Refer to
“REMOVING/
INSTALLING THE
REAR SHOCK
ABSORBER
ASSEMBLY”.
3
Nut/washer/bolt
2/2/2 Bolt =
117
mm
(4.61 in)
4
Connecting arm
2
5
Nut/bolt/spacer
1/1/1 Bolt =
105
mm
(4.13 in)
6
Rear shock absorber assembly
1
7
Centerstand
1
8
Nut/bolt/spacer
1/1/1 Bolt
= 76 mm (2.99 in)
Summary of Contents for FJR1300R
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM...
Page 531: ...8 35 ELEC LIGHTING SYSTEM...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...