5.
After the first 10 hours. Use standard pre-
mix ratio of fuel and oil. Refer to page
1-13.
å
Hours
After test run
1.
Check for water in the gear oil.
2.
Check for fuel leakage in the cowling.
3.
Install the flushing kit
1
.
4.
Set the gear shift to “N” position, and then
flush the cooling water passage with
engine running at idle.
c
C
Be sure to supply sufficient water when
flushing the cooling water passage, other-
wise the engine may overheat.
w
9
Be sure to remove the propeller before
using the flushing kit.
9
Keep hands, hair and clothes away from
the propeller shaft while the engine is
running.
6885J11
1-18
9
8
7
6
5
4
3
2
1
6F610180
0
1
2
10
Predelivery check
6S310070
1
6885J11_01 07.9.26 15:11 Page 21
Summary of Contents for 55DEHD
Page 4: ......
Page 24: ...GEN INFO 1 19 6885J11 General information MEMO ...
Page 85: ...6885J11 9 8 7 6 5 4 3 2 1 4 16 MEMO ...
Page 154: ...LOWR 6 25 6885J11 Lower unit Shimming T3 M3 M2 68860480 T2 T1 M1 P R F ...
Page 260: ... MEMO ...
Page 261: ... MEMO ...