BRKT
7-3
6885J11
Bracket unit
Checking the throttle cable and shift
cable (EHD)
1.
Check the throttle cable and shift cable
for smooth operation.
2.
Check the inner wire, outer wire of the
throttle cable and shift cable. Replace if
the outer wire is bent or damaged or the
rubber seals are damaged.
Assembling the tiller handle (EHD)
1.
Install the throttle shaft
1
into the tiller
handle
2
so that the pin
3
of the throttle
shaft
1
aligned with the mating surface
of the tiller handle
2
in horizontal posi-
tion.
2.
Insert the throttle cable
4
into the gear
5
until the inner cable is winded with the
gear.
3.
Turn the throttle shaft
1
clockwise to
wind the inner cable until the bolt
6
comes in contact with tiller handle.
4.
Tighten the bolt
6
and lock nut
7
.
NOTE:
Check that the fully closed mark of the indi-
cator is aligned with the mark on the tiller
handle.
5.
Install the bushing
8
, spring
9
, washer
0
, throttle grip
q
and cover
w
into the
tiller handle
2
.
1
3
2
A
2
61U70470
3
6887002A
7
6
1
6
7
68870010
2
8
0
q
9
w
0
68870040
Lock nut
7
:
11 N·m (1.1 kgf·m, 8.1 ft·lb)
68870025
4
5
6885J11_07a 07.10.12 15:16 Page 6
Summary of Contents for 55DEHD
Page 4: ......
Page 24: ...GEN INFO 1 19 6885J11 General information MEMO ...
Page 85: ...6885J11 9 8 7 6 5 4 3 2 1 4 16 MEMO ...
Page 154: ...LOWR 6 25 6885J11 Lower unit Shimming T3 M3 M2 68860480 T2 T1 M1 P R F ...
Page 260: ... MEMO ...
Page 261: ... MEMO ...