
6885J11
7-40
9
8
7
6
5
4
3
2
1
PTT unit
NOTE:
If the fluid is at the correct level, the fluid
should overflow out of the filler hole when the
reservoir cap is removed.
21. Install the new O-ring and reservoir cap
5
, then tighten it to the specified torque.
NOTE:
Bleeding the PTT unit 2–3 times, and then
check the fluid level. To bleed the PTT unit,
refer to page 7-62.
5
68870670
Reservoir cap
5
:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
Recommended PTT fluid:
ATF Dexron
2
6885J11_07b_1 07.10.1 9:04 Page 7
Summary of Contents for 55DEHD
Page 4: ......
Page 24: ...GEN INFO 1 19 6885J11 General information MEMO ...
Page 85: ...6885J11 9 8 7 6 5 4 3 2 1 4 16 MEMO ...
Page 154: ...LOWR 6 25 6885J11 Lower unit Shimming T3 M3 M2 68860480 T2 T1 M1 P R F ...
Page 260: ... MEMO ...
Page 261: ... MEMO ...