6885J11
3-12
9
8
7
6
5
4
3
2
1
Control system
4.
Check that the mark
b
on the flywheel
magnet is aligned with the pointer
4
on
the pulser coil assembly.
5.
If it is not aligned, remove the control link
rod
5
, and then adjust the control link
rod length
c
.
NOTE:
To adjust the control link rod, refer to page
3-6.
68830250
b
4
68830038
5
c
Length
c
(reference data):
71 mm (2.79 in)
6.
Check the screw out length
d
of the
adjusting screw
3
.
7.
Slowly turn the flywheel magnet clock-
wise, and check that the timing plate
1
is
aligned with the scale
e
on the flywheel
magnet in the specified position.
68830260
3
d
Specified length
d
(full advanced, reference data):
55D, 75A:
32.0–33.0 mm (1.26–1.30 in)
85A: 30.0–31.0 mm (1.18–1.22 in)
Timing plate position
e
(full retard):
BTDC 2°
68830270
e
1
6885J11_03 07.9.26 10:24 Page 13
Summary of Contents for 55DEHD
Page 4: ......
Page 24: ...GEN INFO 1 19 6885J11 General information MEMO ...
Page 85: ...6885J11 9 8 7 6 5 4 3 2 1 4 16 MEMO ...
Page 154: ...LOWR 6 25 6885J11 Lower unit Shimming T3 M3 M2 68860480 T2 T1 M1 P R F ...
Page 260: ... MEMO ...
Page 261: ... MEMO ...