PAGE 4
Aquavar IPC Start-Up Genie
CentriPro
COMMISSIONING STEPS
PLEASE NOTE: Programming is required BEFORE any control wiring is performed.
1. Power on drives
2. Complete Programming. (Transducer fault will be present as your control wiring is not
installed.) It is OK to continue to program.
3. Power down both drives and then install control wiring. Follow wiring illustration later in this
guide.
Select Quick Menu
Select Parameter 04
“Start-Up Genie”
You are now able to start the Start-Up
Genie