![background image](http://html2.mh-extra.com/html/xerox/nuvera-100/nuvera-100_installation-planning-manual_3382809043.webp)
Installation Planning Guide
4- 5
Preparing for installation
.
Connectivity requirements
An Ethernet local area network (LAN) running Transmission
Control Protocol/Internet Protocol (TCP/IP), AppleTalk, or Novell
NetWare software is the network communication system used to
transport documents from the client workstation to the printing
system.
Ethernet specifications
The Ethernet connection to the controller processor must be
compatible with the Institute of Electrical and Electronics
Engineers (IEEE) 802.3 standard.
The Ethernet interface on the controller processor is a 10 Mb/sec
twisted pair standard (10BaseT, 100BaseT, and 1000BaseT).
Attachment Unit Interface (AUI) Coax Ethernet is enabled with an
adapter cable.
Work with your system administrator to assess what type of
network you have and what modifications need to be made to
supply an Ethernet connector to the controller processor.
Token Ring specifications
Users of network client workstations may send print jobs to the
printer using TCP/IP, Novell 3.x, or Apple Talk network protocol.
The Token Ring connection to the controller processor must be
compatible with the Institute of Electrical and Electronics
Engineers (IEEE) 802.3 standard.
The controller processor has a 4 MB or 16 MB Token Ring Auto
interface (16 MB is preferred).
Post-install
Become familiar with support services available.
Establish supplies maintenance procedure.
Provide ongoing system maintenance.
Adjust the printer alignment and magnification.
Order additional documentation, as necessary.
Customer
Customer
Customer and
Xerox
Xerox
Customer
_________
_________
_________
_________
_________
Week
Activity
Responsibility
Date
completed
Summary of Contents for Nuvera 100
Page 1: ...installation Xerox DocuPrint 100 115 135 155 180 EPS 701P24750 April 2005 guide planning...
Page 6: ...iv Installation Planning Guide Table of contents...
Page 16: ...xiv Installation Planning Guide Introduction...
Page 76: ...6 28 Installation Planning Guide Printer requirements and specifications...
Page 77: ...Installation Planning Guide 6 29 Printer requirements and specifications...
Page 78: ...6 30 Installation Planning Guide Printer requirements and specifications...
Page 79: ...Installation Planning Guide 6 31 Printer requirements and specifications...
Page 80: ...6 32 Installation Planning Guide Printer requirements and specifications...
Page 82: ...6 34 Installation Planning Guide Printer requirements and specifications...
Page 86: ...7 4 Installation Planning Guide System connections...