Installation steps:
·
Crane specifications: the weight of ESS is 2.6T, the need to use the rated lifting weight
≥ 5T motor crane, sling 4 (equal length), each sling length ≥ 5m.
·
Climb up the man-ladder, connect the sling with the 4 rings on the top of ESS, and pull
the sling until it is taut, but do not lift the equipment so that the cardboard is off the
ground. (To avoid product from tipping due to bias of COG during disassembly bolts)
·
Unscrew the bolts on the lower door frame of the equipment, open the lower front and
rear doors, and use a socket wrench to take out the four bolts connecting the equipment
to the base, then close doors.
·
Lift ESS from the transportation base on the predetermined position of the metal base,
confirm holes on ESS corresponding to holes on metal base. Before the bolts and base
fastening, the sling needs to be straightened and in a taut state. Open the front and rear
2 doors, use the M12 combination screws (4PCS) to fix ESS to metal base and tighten
it with a socket. Confirm the torque of 96NM with the help of torque wrench.
·
Apply glass glue to the 4 screws and the gap around the screw holes to seal the screws
and the gap, and then fasten the 2 lower doors.
4pcs M12
Bolts
Metal Base