Copyright | NZS Installation and Operation Manual
27
Use an electric screwdriver to remove the screws on the rear lower door panel, then move
the door aside and confirm that the switch is disconnected according to the following table
power state. Then connect cables referring to electrical diagram.
Status
Status confirmation
Switch
Circuit Breaker
Off
Off
Horizontal
Downward
BMS Insulation
Switch
After finishing input cable connection, please turn to front and start connection for Battery
packs. Use an electric screwdriver to unscrew the screws on the upper and lower door panels
of the battery compartment, then open the compartment door.
DC Power Cable
Emergency Stop
+ Emergency
- Stop Output
Eme
Stop Input -
Ethernet
Grounding
220V Input
(Front)