4.3 Installation of Products
Metal Base Installation
Prepare the impact drill, confirm the drill bit specification M12, check the specification and number
of expansion screws. Referring to the following fixed hole position, use the impact drill to align the
hole center drilling, drilling depth of 150mm.
Put the metal base on concrete base. After cleaning up the residue of drilling, put 5pcs expansion
bolts (M12x150mm stainless steel) into the corresponding holes, use a hammer to pound the bolts
to the end, then add nuts + spacers and tighten them with a socket, confirm the torque of 96N·M
via torque wrench.
After installation, please take care of levelness of metal base. Use leveling ruler to check levelness,
if it’s over ±1mm, please adjust levelness with leveling mechanism. There are two bolts designed
for leveling mechanism. Tightening upper bolt is used for raise up while lower bolts is used for
bringing down the base. Please adjust 6 set of bolts front and back based on measured levelness
via spanner till levelness is ≤±1mm.
M12 x 150
TORQUE 96Nm
Levelness
adjustment